TEST - Copy of Tech Note Library

TEST - Technical Note Library

Browse technical notes by number and product category. Each note includes a PDF, a brief description, and a video where available.

Looking for other documents? Visit Dimensional Drawings or Technical Resources.

200s — Valco valves, two position (10 notes)
Tech Note 201

W and UW valves: operation and cleaning

Precautions and instructions for disassembling, cleaning, and reassembling W and UW type Valco valves.

Tech Note 202

4-port internal sample injector

Schematic flow diagram for the 4-port internal fixed-volume sample injector, W and UW valves, all series.

Tech Note 203

6-port external volume sample injector

Schematic flow diagram for the 6-port external volume sample injector, W and UW valves, all series.

Tech Note 204

8-port external volume sample injector

Schematic flow diagram for the 8-port external volume sample injector, W and UW valves, all series.

Tech Note 205

10-port multifunctional valve

Schematic flow diagram for the 10-port multifunctional W and UW type valve, all series.

Tech Note 206

4-port switching valve

Schematic flow diagram for the 4-port switching valve, W and UW valves, all series.

Tech Note 207

3-port switching valve

Schematic flow diagram for the 3-port switching valve, W and UW valves, all series.

Tech Note 208

Dual sample size internal volume injectors

Instructions for rotating the rotor to change between the two sample sizes of a dual-volume injector.

Tech Note 209

Simultaneous injection: same sample onto 3 columns

A 14-port valve plumbing arrangement for loading the same sample into three loops and injecting onto three columns.

Tech Note 210

Simultaneous injection: 2 samples, 2 columns

A 12-port valve arrangement for loading and injecting two different samples onto two different columns.

300s — Older Valco valves, with external coil spring (2 notes)
Tech Note 304

P and E series valves: operation and cleaning

Operation notes, precautions, disassembly, cleaning, and reassembly for P and E series Valco valves.

Tech Note 308

10-port multifunctional P type valve

Schematic flow diagram for a two-position 10-port multifunctional switching valve, P type, all series.

400s — Valve actuation (3 notes)
Tech Note 405

Two-position helical drive air actuator

Implementation of Valco two-position air actuators using older solenoids; includes the paired 3-way solenoid arrangement.

Tech Note 406

Multiposition helical drive air actuator

Implementation using a 4-way solenoid and continuous air application for Valco multiposition actuators.

Tech Note 419

Position feedback for two-position air actuators

Installing Position Feedback for Air Actuators (PFAF) to provide permanent contact closure feedback.

500s — Fittings (9 notes)
Tech Note 501

Fused silica adapters

Installation and use of fused silica adapters for open tubular columns and Valco fittings.

Tech Note 502

Cheminert connecting accessories

Using the flanging tool to prepare PTFE tubing and assemble Cheminert tube end fittings.

Tech Note 503

Valco fitting instructions

Tubing preparation and assembly instructions for metal and PEEK zero dead volume fittings.

Tech Note 504

EZR and IZR installation instructions

Installing external and internal reducers to adapt existing fittings and small transfer lines to Valco connections.

Tech Note 505a

Cheminert flangeless fittings with collapsible ferrule

Assembly instructions for the one-piece collapsible ferrule used in Cheminert flangeless fittings.

Tech Note 506

IZERA1.5 installation instructions

Installation of 1/16-inch internal to 1/32-inch external adapters designed to prevent graphite ferrules sticking.

Tech Note 507

Cheminert one-piece 1/32-inch nanovolume fittings

Initial assembly and reuse of one-piece fittings with a breakaway grooved ferrule.

Tech Note 509

Cheminert 360 µm fittings

Installation and use of high-pressure fittings for direct connections to 360 µm OD tubing.

Tech Note 510

Zero dead volume fill port fittings

Installation and needle-seal adjustment for the ZVISF-1 fill port fitting and its polymer bushing.

600s — Miscellaneous (8 notes)
Tech Note 603

Micrometering needle valves

Mounting and operating notes for BNV1 and ZBNV1 bulkhead-mounted micrometering valves.

Tech Note 605

DV-12 and DV-22 diaphragm valves: operation

Installation, actuation, and operating instructions for DV-12 and DV-22 sample injectors.

Tech Note 607

Air-actuated Valco on/off valves

Installation and operation of high-pressure air-actuated Valco on/off valves.

Tech Note 614

Model 202 flow controller

Specifications and adjustment instructions for the upstream-referenced Model 202 flow controller.

Tech Note 621

Lapping ends of fused silica tubing

Using the Fused Silica Prep Kit to produce clean, square tube ends for low dead volume connections.

Tech Note 622

DV-13 and DV-23 diaphragm valves: operation

Installation, actuation, and operating instructions for DV-13 and DV-23 sample injectors.

Tech Note 623

DV-13 and DV-23: diaphragm replacement

Disassembly and diaphragm replacement procedures for DV-13 and DV-23 valves.

700s — Valco selectors (multiposition valves) (1 note)
Tech Note 715

MW and UW selectors: cleaning and alignment

Cleaning, rotor replacement, and alignment for MW and UW multiposition selectors on microelectric or universal actuators with keyed hardware.

800s — Cheminert valves (8 notes)
Tech Note 801

Cheminert HPLC and UHPLC injectors

Cleaning, inspection, and rotor replacement instructions for Cheminert HPLC and UHPLC injectors.

Tech Note 802

Cheminert C1 and C1CF: installation and maintenance

Panel mounting, fitting connections, use, and maintenance for Cheminert C1 and C1CF valves.

Tech Note 807

Cheminert 4-port internal sample injector

Schematic flow diagram for 4-port internal fixed-volume Cheminert injectors, high- and low-pressure models.

Tech Note 811

Cheminert C22(Z), C24(Z), and C25(Z)

Cleaning and rotor replacement for Cheminert C22, C24, C25, C22Z, C24Z, and C25Z models.

Tech Note 813

Cheminert CN2 and CN4: cleaning and rotor replacement

Maintenance and fitting precautions for CN2 and CN4 valves with 100-micron flowpaths and one-piece nanovolume fittings.

Tech Note 815

Cheminert flow-through stream selectors

Schematic flow diagrams for selectors that vent non-selected streams, including the Model C5F.

Tech Note 821

Cheminert C55 and C65(Z) selectors

Installation, electrical connections, motor control, and maintenance for C55, C65, and C65Z selectors.

Tech Note 828

Cheminert C42R: cleaning and rotor replacement

Cleaning, disassembly, and rotor replacement for the Cheminert Model C42R valve.